Ekhlasi, M., Fiorini, A., Dagenais, M. R., Ezzati-Jivan, N., & Lamothe, M. (2025). HybridRCA: Lightweight Critical-Path-Aware Hybrid Tracing for Root-Cause Analysis in Production Microservices. In IEEE International Conference on Software Maintenance and Evolution (ICSME) (pp. 553-564). https://doi.org/10.1109/icsme64153.2025.00056