Keyword
critical path
Recurring research keyword critical path: 5 papers by Naser Ezzati-Jivan, with summaries, citations, and source links.
- HybridRCA: Lightweight Critical-Path-Aware Hybrid Tracing for Root-Cause Analysis in Production Microservices (2025)
- Analyzing Performance Variability in Alibaba's Microservice Architecture: A Critical-Path-Based Perspective (2024)
- Efficient Unsupervised Latency Culprit Ranking in Distributed Traces with GNN and Critical Path Analysis (2024)
- Performance Anomaly Detection through Sequence Alignment of System-Level Traces (2022)
- Multi-Level Execution Trace Based Lock Contention Analysis (2020)